Monday, June 3, 2019

Defining And Understanding A Formwork System Construction Essay

Defining And Understanding A Formwork System Construction adjudicateNowadays, verbal expression industry in Malaysia is a mature industry. The Malaysia gimmick sector is regarded as a catalyst for growth while its own per constituteance serves as an indicator to the nations economy. It is supported by a fraternity of construction player encompass developers, contractors, building material and equipment, suppliers, manufacturers, financiers, regulators and different in the value chain (Lynda, 2006).Formwork constitution is defined as the constitution of support for freshly placed cover including the mould or sheathing which contacts the cover as well as reenforcement members, hardware, and necessary bracing. Formwork system development has paralleled the growth of concrete construction by dint ofout the twentieth century. Both designers and builders are aware of the need of construction industry in order to develop creative innovations from traditional method to improve s tep and economy in the face of incoming construction industry challenges.Formwork is the largest live role for a typical multistory reinforced concrete building. It normally speak to account around 40% to 60% of the speak to of the concrete frame and for about 10% of the total building cost. Besides, the demands and requirement of the clients have continued to grow and it is essential to find ways to build faster, cheaper and better spirit building. Consequently, cost, productivity and quality of formwork system is variable by the system and material choosing. Therefore, trust as much as issue possible must be done to begin with make the decision of choosing formwork.Definition of FormworkFormwork is a temporary boarding or sheeting erected to contain freshly placed and compacted concrete until it has gained sufficient strength to be self-supporting. The appearance of the finished concrete depends on the face texture and stiffness of the formwork. (Dictionary of Quarrying Te rms)Formwork is the term given to either temporary or permanent moulds into which concrete or similar materials are poured. In the context of concrete construction, the falsework supports the shuttering moulds. (Wiki Answer)Definition of Steel Wall Form SystemSteel is a material by and large hard, strong, durable, malleable alloy of iron and carbon, usually containing between 0.2 and 1.5 percent carbon, often with other constituents such as manganese, chromium, nickel, molybdenum, copper, tungsten, cobalt, or silicon, depending on the desired alloy properties, and astray used as a structural material. Steel rampart form system is one of the Engineered Formwork systems. (Answer.com)This formwork is built out of prefabricated modules with a metal frame (usually brand and aluminum) and covered on the application (concrete) side with material having the wanted surface structure (steel, timber, etc.). The two major advantages of formwork systems, compared to traditional timber formwor k, are speed of construction (modular systems clip or screw together quickly) and lower life-cycle costs (barring major force, the frame is al more or less indestructible, while the covering may have to be replaced aft(prenominal) a few or a few dozen uses, depending on the applications). (Nation Master.com)Definition of Conventional Timber formworkConventional Timber formwork is also as cognise as Traditional timber formwork. The formwork is built on site out of timber and plywood. It is easy to produce but time-consuming for larger structures, and the timber face up has a relatively short lifespan. It is still used extensively where the labour costs are lower than the costs for procuring re-usable formwork. It is also the most flexible fictitious character of formwork, so even where other systems are in use, complicated sections may use it. (Nation Master.com)Background of ResearchFormwork is the single largest cost component of a concrete buildings structural frame. The cos t of formwork exceeds the cost of the concrete or steel, and in some situation the formwork costs more than the concrete and steel combined. (Robert Leroy Peurifoy, Garold D. Oberlender, 1996)For some structures, deciding the precession of the formwork design allow to reduce the total frame costs by as much as 25%. This reduction involved direct cost and indirect cost. Formwork is one of the main components in a project, it efficiencies in accelerate the construction schedule in order to reduce interest cost, labour cost, machinery cost and etc during construction and early complete for the project. (Formwork for Structure, 1996)Formwork can be categorized into two types, which are conventional timber formwork and system formwork. Conventional timber formwork is the most car park type of formwork, local contractors are already familiar and get used with this method. System formwork is a new engineering science which introduced by Industrialized Building Systems. establish on lack of knowledge on this technology, local contractor still refused to apply this method in project broadly. The main reason they refused to applied this technology is cost of conventional formwork is much lower than IBS or the technology of it.Justification of ResearchPresently, high rise building project is increasing in Malaysia. It consider as the main trends in Malaysias development policy. Steel wall form system and conventional timber formwork both is the main method to construct a building. The contribution of this research lead be explorer and analyzed in order to allow provided information to allow contractor in placing formwork design.Problems StatementAdapting the engagement of Industry Building Systems in the construction of high rise building had significantly giving advantages in various aspects, such as reducing the construction cost, speed of construction, minimizing manpower, environmentally friendly, improved site safety and better quality construction (Shaari 2004 ).In order to obtain the advantages of IBS, during pre-planning stage, contractor has to decide which type of formwork is most suitable to be use in the project before contractor tender the project. For a consultant, he must have well sensed in selecting the suitable formwork system to satisfy clients requirement.Therefore, this dissertation leave behind suggest and provide a detail of comparison of costing and productivity between steel soak wall form and conventional timber formwork for high rise building to contractor and consultant. Consequently, they are able to choose suitable formwork system instead of ontogeny quality and productivity of work, and save time and cost in the same time.Objectives of StudyThe aim of this research is to compare and find out whether steel wall form system or conventional timber formwork is more suitable in high rise residential building construction.The specific objectives wereTo analyze and cost and labor force required for both types of formw ork system.To define and study productivity of steel wall form and conventional timber formwork.To study into different quality outcome from the both formwork system.To compare of costing and productivity between steel wall form and conventional timber formwork.Scope of ProjectThis research will focus on the local projects that are using steel shear wall form and traditional formwork system. The study is limited to high-rise residential building construction. Site visit to the high rise residential building project will be carry out in this research. One project will be sampled for this research with two different of formwork system for wall only.Research MethodologyDesk StudyThe data, information and reference materials will be quested through reference books, journals, magazines, newspaper and etc will be major tunnels for me to gather information for my research title. Initial study is carried out by comprehensive appraise on the literature on all the resources, to gain the ba sic understanding and ground theory on the relevant topics and area, which then be used in generating efficacious information and data.Internet ResearchInternet is a major tool to allow me finds out the information about steel shear wall form and traditional timber formwork. It also enables me to get the latest information which is related with my dissertation.Site VisitThroughout site visit, it allow me to understand the method of the construction in apply both different types of formwork in detail. Interview will be carrying out during the construction site visit. The people to be interview include contractors and other relevant party.Case studyCase study about steel and timber formwork system used in high rise residential construction will be carried out. Interview will be carried out during the construction site visit. The people to be interview included contractor, project managers and other relevant party.Chapter OrganizationChapter 1 IntroductionThis chapter has been a gener al introduction to dissertation research and outlines the main aims and objectives of this dissertation. It also consists of clarity of problem statement and confession of the research before to start this research.Chapter 2 Literature ReviewThis chapter explains and describes the characteristic and the usage for the steel wall form system and conventional timber formwork. It wills tension in the usage of both type of formwork in local high rise residential building construction. Besides, this chapter is going to introduces steel wall form system and conventional timber formwork in costing, productivity, quality, advantages and disadvantages.Chapter 3 Research MethodologyThis chapter will explain the process of the whole dissertation and the type of research Methodology. The method of collect data, information and analysis will be explained in this chapterChapter 4 Data CollectionThis chapter will be completed by carried out one shift study in order to understand in more detail o f the steel wall form system and conventional timber formwork. Besides, a structure interview is conducted for analysis. Data and photographs will be show as an evidence for case studies.Chapter 5 Data analysisThis chapter carries out analysis and discussion of the data collected from the interviewer and case study. The data analysis will included cost analysis, productivity analysis, quality analysis and manpower analysis.Chapter 6 Conclusion and RecommendationThis chapter includes the objectives review of this dissertation. All the studies on this dissertation will be concluded in this chapter too. There will be further recommendation of this A Study on Cost, Productivity and Quality Comparison of Using Steel Wall Form System and Conventional Timber Formwork in Residential High Rise Building.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.